Editor's Review

The project will be completed by 2027.

The Kenya Urban Roads Authority (KURA) has commenced the construction of the Ngong Road-Naivasha Road flyover at Junction Mall.

In a statement on Monday, September 16, KURA said the project is aimed at enhancing the efficiency of Ngong Road through grade separation to address the persistent traffic congestion.

The project which is being funded by a loan of Ksh3.58 billion from the Spanish of Spain Corporate International Fund (FIEM) will be completed by 2027.

“The project fully funded by a concessional loan of Kshs. 3.38 Billion (EUR 25.3M) from the Spanish of Spain Corporate International Fund (FIEM) is expected to be completed by July 2027,” read part of the statement.

According to KURA, the project aligns with the Government's broader strategy to strengthen infrastructure, aiming to foster long-term economic growth and enhance urban transportation systems.

Ongoing construction of Ngong -Naivasha Road Flyover

The authority also noted that the project is designed to support the country’s development and ease the movement of people and goods across Nairobi.

KURA also mentioned that the flyover will cut down travel time for motorists, passengers, and public transport users using Nong Road.

“The new Ngong Road/Naivasha Road Flyover will bring a range of benefits to Nairobi residents, starting with a significant reduction in traffic congestion. By eliminating bottlenecks at key junctions, the flyover will greatly cut down travel time for motorists, public transport users, and pedestrians alike,” KURA stated.

The authority further said the safety of motorists, pedestrians, and cyclists will be enhanced through the inclusion of Non-Motorized Transport (NMT) facilities, and upgraded drainage systems will help mitigate frequent flooding risks during the rainy season.

KURA urged motorists to drive cautiously on Ngong Road and follow guides by traffic marshals as they approach the section under construction.