Editor's Review
KeNHA has announced the temporary closure of the Lower Kabete-Ndumbuini/Kapenguria Road-Uthiru Interchange.
The Kenya National Highways Authority (KeNHA) has announced the temporary closure of the Lower Kabete-Ndumbuini/Kapenguria Road-Uthiru Interchange.
In a notice on Wednesday, November 25, the authority said the closure will affect traffic from Wednesday, December 2, as contractors undertake reconstruction of the interchange ramps, loops and slip roads.
Join our WhatsApp Channel for the latest news updates.
"The Kenya National Highways Authority (KeNHA) would like to inform the public of a temporary traffic disruption following closure of Lower Kabete - Ndumbuini/ Kapenguria Road - Uthiru Interchange. This is due to scheduled road works for re-construction of the Interchange Ramps, loops and Slip Roads, from Wednesday, 2nd December 2026 to Sunday, 31st January 2026," the notice read.
As such, KeNHA outlined alternative routes that motorists will be required to use during the construction period to minimise traffic disruption.
Read More
Traffic travelling from A8 (Nairobi) to Ndumbuini will have three alternative routes.
Motorists may exit at Kabete Technical along A8 (Waiyaki Way), proceed to Naivasha Road roundabout, then use the Uthiru Underpass before turning back to the Nairobi-bound A8 carriageway and accessing Marigioni Cabro Road to Ndumbuini Shopping Centre.
Alternatively, motorists can exit at Lead Way Petrol Station and proceed to the Uthiru Underpass before turning back to the Nairobi-bound carriageway and using Marigioni Cabro Road to reach Ndumbuini Shopping Centre.
The third option involves proceeding to the 87/Muhuri Interchange, located after Shell Kinoo, and using the 87-Ndumbuini Road after 87 Mall.
For motorists travelling from Rironi and Nakuru to Ndumbuini, KeNHA directed them to turn at Muhuri Interchange and use the Muhuri-Ndumbuini Road.

Meanwhile, traffic travelling from Ndumbuini to A8 will have two alternative routes.
Motorists can use Marigioni Cabro Road to access the Nairobi-bound A8 carriageway. Alternatively, they can use Ndumbuini Road to reach the 87/Muhuri Interchange and join the Nairobi-bound A8 carriageway or proceed towards Rironi using the Nakuru-bound carriageway.
Traffic from Uthiru and Kawangware will also be affected by the closure.
KeNHA directed motorists from the two areas to use either the Uthiru Underpass or Muhuri Interchange for all turning manoeuvres to and from Naivasha Road.
The authority urged motorists to observe the temporary traffic arrangements throughout the construction period.
"KeNHA advises motorist to follow the traffic management plan, project road signs and co-operate with police and traffic marshals on site," the notice added.
This comes days after the Kenya Urban Roads Authority (KURA) announced the partial closure of a section of Gitanga Road in the Kawangware area.
In a notice on Thursday, November 19, KURA said the temporary traffic disruption would take effect on Thursday, November 26 and remain in place until Saturday, December 5.
The authority said the closure would begin at 6 AM on Thursday and end at 6 PM on Saturday, with both dates inclusive.
"We wish to notify the general public that a section of Gitanga Road in Kawangware area will be partially closed as from 6 AM Thursday 26th November, 2026 till 6 PM Saturday 5th December 2026, both days inclusive," the notice read.
KURA explained that the temporary closure was necessary to allow contractors to undertake drainage improvement works along the affected road section.
"The temporary closure will enable safe construction of a cross culvert that will enhance drainage along the road corridor," the notice added.
KURA advised motorists to use the alternative routes provided in an accompanying traffic diversion sketch and follow instructions from traffic police officers and marshals deployed at the site.
"We urge motorists to use the alternative routes shown in the sketch below and to follow the guidance of traffic police and marshals on site. We sincerely apologise for the inconvenience caused as we endeavour to Transform Urban Mobility," the notice concluded.





